
Most tile fields are constructed of heavy gauge plastic pipe fitted and cemented together. The holes along the length of the pipe allow the gray water to run out evenly along the gravel base.
|

Once the tank, distribution box and tile field are properly installed, a county health department official inspects and approves the system. Following approval, the "envelope" of gravel around the pipes can be completed. In many locations, straw is used to cover the gravel and keep it free of sand and silt.
|